CETO 5 Unit #1 ready to deploy

Perth Wave Energy Project

The Perth Wave Energy Project, located at Garden Island, Western Australia was the first demonstration of a complete grid-connected CETO system anywhere in the world, the only wave project to consist of more than one wave energy unit connected together and the only wave project to produce both power and freshwater.

Read more about the Perth Wave Energy Project here.

  • 3 unit CETO array operating off Garden Island

    Perth Wave Energy Project

  • BA transported by trailer to Carnegie staging area at AMC, post retrieval

    Perth Wave Energy Project

  • Two CETO 5 units installed and operating

    Perth Wave Energy Project

  • CETO unit being lifted from water onto hardstand on AMC, post retrieval

    Perth Wave Energy Project

  • CETO 5 3 Unit Array

    Perth Wave Energy Project

  • CETO 5 Unit #1 installed and operating - fully submerged

    Perth Wave Energy Project

  • CETO 5 Unit 1 subsea

    Perth Wave Energy Project OLYMPUS DIGITAL CAMERA

  • CETO 5 Unit #1 tow out to offshore site

    Perth Wave Energy Project

  • CETO 5 Unit #1 ready to deploy

    Perth Wave Energy Project

  • Carnegie Planning Engineer alongside foundation installation barge

    Perth Wave Energy Project

  • CWE employee observing pipeline installation from onshore project site

    Perth Wave Energy Project

  • Carnegie operations team member controlling position of BA

    Perth Wave Energy Project

  • Diver performing inspection of CETO 5 Unit#1

    Perth Wave Energy Project OLYMPUS DIGITAL CAMERA

  • Diver installation of offshore pipeline

    Perth Wave Energy Project

  • Dr Michael Ottaviano and the Hon. Ian Macfarlane switching in the Perth Wave Energy Project

    Perth Wave Energy Project

  • Inspection dive of the connection between PLEM and seabed pump

    Perth Wave Energy Project

  • Interior of onshore power plant

    Perth Wave Energy Project

  • Pre-Deployment system integration testing

    Perth Wave Energy Project

  • Pre-Deployment system integration testing

    Perth Wave Energy Project

  • ROV operator during Unit 3 installation

    Perth Wave Energy Project

  • Unit 3 on floating dock at AMC preparing for deployment

    Perth Wave Energy Project

  • CETO 5 Unit # 1 POD operating underwater

    Perth Wave Energy Project